{"id":24809,"date":"2024-12-06T16:45:54","date_gmt":"2024-12-06T16:45:54","guid":{"rendered":"https:\/\/ncnguyana.com\/2023\/?p=24809"},"modified":"2024-12-06T16:45:55","modified_gmt":"2024-12-06T16:45:55","slug":"rehabilitation-of-lenora-market-road-to-begin-on-monday","status":"publish","type":"post","link":"https:\/\/ncnguyana.com\/2023\/rehabilitation-of-lenora-market-road-to-begin-on-monday\/","title":{"rendered":"Rehabilitation of Lenora Market Road to Begin on Monday"},"content":{"rendered":"<div id=\"fb-root\"><\/div>\n\n<p><em>By Delicia Janneire | November 11, 2024<\/em><\/p>\n\n\n\n<p>President Irfaan Ali announced that rehabilitation works on the Lenora Market road will begin on Monday. <\/p>\n\n\n\n<p>During a visit to the market, where he engaged with vendors, the Head of State confirmed that the road will be expanded to 16 feet, with concrete drains on both sides. <\/p>\n\n\n\n<p>Additionally, a new bridge will be constructed to replace the existing one, which has been deemed unsafe.<\/p>\n\n\n\n<p>The President also assured vendors that every effort will be made to minimize disruption during the roadworks, ensuring they can continue their businesses as usual. <\/p>\n\n\n\n<p>Once the roadworks are completed, vendors currently positioned along the market road will be reinstated.<\/p>\n\n\n\n<p>In a bid to improve the overall functionality and safety of the market, President Ali announced that market hours would be extended. <\/p>\n\n\n\n<p>A new security system, including 24-hour electronic monitoring with cameras, will be implemented to enhance the safety of vendors and shoppers.<\/p>\n\n\n\n<p>The market is also undergoing further upgrades, including enhanced washroom facilities, additional parking, and systems to assist the elderly. <\/p>\n\n\n\n<p>A designated shower and hammock area will be provided for farmers who need to stay overnight or spend extended hours at the market. <\/p>\n\n\n\n<p>Improved drainage systems will ensure a cleaner environment for business operations.<\/p>\n\n\n\n<p>President Ali emphasized that a new market committee would be established to ensure the proper upkeep of these new facilities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Delicia Janneire | November 11, 2024 President Irfaan Ali announced that rehabilitation works on the Lenora Market road will begin on Monday. During a visit to the market, where&hellip;<\/p>\n","protected":false},"author":4,"featured_media":24795,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[366,350],"tags":[],"class_list":["post-24809","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-development","category-news"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/posts\/24809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/comments?post=24809"}],"version-history":[{"count":1,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/posts\/24809\/revisions"}],"predecessor-version":[{"id":24810,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/posts\/24809\/revisions\/24810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/media\/24795"}],"wp:attachment":[{"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/media?parent=24809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/categories?post=24809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/tags?post=24809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}