{"id":21173,"date":"2024-07-08T16:51:32","date_gmt":"2024-07-08T16:51:32","guid":{"rendered":"https:\/\/ncnguyana.com\/2023\/?p=21173"},"modified":"2024-07-08T16:52:10","modified_gmt":"2024-07-08T16:52:10","slug":"21173-2","status":"publish","type":"post","link":"https:\/\/ncnguyana.com\/2023\/21173-2\/","title":{"rendered":"Pre-Condition Property Survey Begins for East Bank Demerara Road Improvement Project"},"content":{"rendered":"<div id=\"fb-root\"><\/div>\n\n<p>The Ministry of Public Works has initiated pre-condition property surveying for the East Bank Demerara road improvement project, spanning from Good Success to Timehri. <\/p>\n\n\n\n<p>The survey aims to document the current state of infrastructural conditions along the roadway, encompassing interior and exterior aspects of properties such as walls, walkways, fences, and bridges. <\/p>\n\n\n\n<p>Surveyors are seeking permission from property owners to capture visual documentation, which includes taking photographs, and individuals must consent by signing a formal consent form.<\/p>\n\n\n\n<p>Public Works Minister Juan Edghill emphasized the significance of these surveys in preventing future disputes over compensation for structures built along the road reserve after project announcements. <\/p>\n\n\n\n<p>He noted that previous surveys had already identified potential obstructions, ensuring preparedness for the project&#8217;s execution phase.<\/p>\n\n\n\n<p>The pre-condition surveying of properties will continue until July 30, paving the way for physical roadworks to commence on August 1, according to Minister Edghill. <\/p>\n\n\n\n<p>The $76 million USD project is slated for completion within a 36-month timeframe and spans approximately 24 kilometers, divided into three sections: Section A (Good Success to Supply), Section B (Supply to Soesdyke), and Section C (Soesdyke to Timehri).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Public Works has initiated pre-condition property surveying for the East Bank Demerara road improvement project, spanning from Good Success to Timehri. The survey aims to document the&hellip;<\/p>\n","protected":false},"author":4,"featured_media":21174,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[366,350],"tags":[],"class_list":["post-21173","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-development","category-news"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/posts\/21173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/comments?post=21173"}],"version-history":[{"count":2,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/posts\/21173\/revisions"}],"predecessor-version":[{"id":21177,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/posts\/21173\/revisions\/21177"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/media\/21174"}],"wp:attachment":[{"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/media?parent=21173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/categories?post=21173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ncnguyana.com\/2023\/wp-json\/wp\/v2\/tags?post=21173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}